Glossaria.net

Glossary Supply Chain / Term

firm planned order (FPO)

A manufacturing order that reserves capacity and allocates material but, unlike a work order, has not been authorized for release to the production floor. MRP planned orders are automatically changed by the system at each regeneration; FPOs are manually controlled by the planner and are normally either turned into actual work orders, or cancelled. A tool for what-if capacity analysis, and also sometimes used to allocate known components on a bill of material that is not complete and requires finalization before releasing to production orders for the floor.

Permanent link firm planned order (FPO) - Creation date 2021-11-03


< finite scheduling Glossary / Supply Chain firm zone >